Tramway Lift Bridge, Nambour, Qld



The tramway lift bridge at Nambour is a low-level timber bridge that spans the Maroochy River between the former depot near River Store Road on the south bank and Store Road on the north bank. Part of the Moreton Central Sugar Mill Cane Tramway, it runs between the banks of the river within formal abutments, though the bank beneath has been reinforced with stones.

The bridge is supported on timber piers sheathed in concrete. A span near the southern bank is moveable and is situated between two timber lift towers. The lift span can be raised by hand using a chain harness and a system of cables and pulleys located on the timber lift towers and balanced by concrete counter weights. It carries metal tramway lines of 2 feet (0.61 m) gauge laid over timber sleepers. Two metal ladders with metal handrails provide access to the top of the lift towers where there is a tubular metal guardrail.



The Moreton Central Sugar Mill opened for crushing in 1897. The lift bridge was part of the Moreton Central Sugar Mill Cane Tramway that connected the mill with cane farms, which developed over many years and was in use until late 2003. It was a key factor in the success of the mill and the development of Nambour.

Extending the tramway network proved expensive due to the nature of the terrain and there were consequent difficulties with the supply of cane to the mill, though by 1905, when the first locomotive, a Krauss 0-6-0 tank locomotive, was purchased, there were 26 miles (42 km) of permanent tramline in use. In 1911 a branch line was constructed to the Maroochy River and although the eastern section of the tramway network continued to be extended, lines on the western side were sold to Maroochy Shire in 1914.



Two short sections of line on the north side were laid, but a shortage of steel and labour during and after WWI delayed further work. Much of the line was temporary, being laid down for the crushing season. In 1917 a lift up bridge was constructed over Petrie Creek. In 1920, the mill board sought permission from the state government to bridge the Maroochy River and this was granted on 10 May 1920. The new bridge was also a lift bridge and was completed by August 1921.

The lift mechanism was necessary as the bridge carried tramline, which had to be level with the land on either side of the river. This made the bridge too low to allow boats to use the waterway. This problem had been addressed since the early nineteenth century by providing bridges with a moveable section. Moveable bridges fall into three types; the bascule bridge, in which two sections hinge upwards, the swing bridge in which a span rotates away from the river, and the lift bridge.

In this type, the moveable span is located between two towers and can be raised vertically by means of a system of cable, pulleys and counterweights. The span remains horizontal when lifted, so that river traffic can pass beneath. In larger bridges, engines control the span's movement, though the Maroochy bridge is hand operated. Lift bridges generally are now an uncommon type and this is believed to be the only remaining example of a tramway bridge with a lift span in Queensland.



The moveable span on the Maroochy bridge lifts to a height of 7.9 metres providing a space 17 feet 5.33 metres above the high water mark for boats to pass through. This bridge linked the northern cane growing areas to the tramway system. It was extended to connect with an isolated line built in 1922 between Coolum Creek and Coolum Beach. This line officially opened in 1923, though it had been in use for some time before this and was also used for the transport of passengers.

Work on the mill and the tramway system continued through the 1930s, though during World War II operations at the mill fell because shipping was disrupted and there were labour shortages. In 1951-2 an extensive program of repairs and line relaying was carried out. In 1956 land at the River Bridge depot was purchased from the Maroochy Co-Operative Society Limited and the store buildings on it sold for removal. A metal shed and annexe were later constructed near the bridge at an unknown date. In 1961 diesel locomotives were purchased which necessitated strengthening bridges and laying heavier rail along the tramways.

The lift-up bridge over Petrie Creek no longer exists and the Maroochy River bridge is now a very rare example of its type in Queensland and may be the only example surviving.

Railway Architecture

Incorporating a beginners guide
to how railways work

travel australia

Australian Towns and Their Railway Stations




travel australia

The Signal Box




travel australia

The Railway Workshops




travel australia

The Railway Yard and Siding




travel australia

The Roundhouse




travel australia

The Turntable




travel australia

The Workers' Accommodation




travel australia

Grain Silos




Design by W3layouts